' 立刻关闭此网页
 
 订单磋商 >> 合同条款 >> 
句库类别:
订单磋商
英文:
If the shipment can not be made within three month as stipulated, the contract will become void.
中文:
如不能按原规定在 3 个月内交货,合同则作废。
点赞次数:313 关闭